
WaterGuard Installation
An in-progress photo of our WaterGuard installation before concrete is poured.

WaterGuard
Fresh concrete covers the completed WaterGuard installation, locking in long-term protection.

Trench
The crew begins by jackhammering along the interior perimeter to create space for the WaterGuard drainage system.

Installation
This is the crucial step that keeps future water out: WaterGuard set right along the foundation wall.

Trench
To begin the waterproofing process, a trench was formed around the basement's footing for the new drainage system.